Abdul Rehman Saad Al-Rubiavi was entrusted with a major fabrication and supply package for the Khobar–Hofouf Water Transmission System, Phase 2 – Group B, supporting a critical expansion of Eastern Province’s utility infrastructure. The project involved the manufacture and delivery of galvanized shaft gratings, staircases, cat ladders (with and without cages), handrails, and heavy-duty checkered plates, all tailored for pump stations, instrumentation buildings, and underground shaft networks.
Alongside these structural elements, Rubiavi fabricated precision-built pipe sleeves and puddle-flanged sections, including pipe sleeves, some subjected to full-penetration welding and 10% radiographic inspection. Custom site-specific components like chain link fence and gates were also fabricated in accordance with SWCC and consultant-approved specifications. This assignment highlights Rubiavi’s ability to coordinate complex, high-compliance fabrication scopes and execute multi-location deliveries under fast-track timelines, reinforcing our role as a trusted supplier for critical water infrastructure.
Ready to take your ideas to the next level? Whether you’re starting from scratch or enhancing an existing product, We are here to help you succeed.
Stay Ahead with Digital Insights
We respect your privacy and promise not to spam. Unsubscribe anytime.
SectionUI. All rights reserved.
Design By: Lahore Graphic Design